evkoPlan Check

Prompt and revision experiment

Can a second look fix the house?

We asked whether a route self-check improves the first drawing set, then gave each design one chance to respond to measured feedback.

Walk the plans
Original Cedar Court sketch showing the house program, sloping site and straight stair direction
The original Cedar Court brief left the room layout open.

What changed?

Each denominator is a run count. Full access means the grader found a compliant route to every required room. This small panel used three model configurations on two new sketches.

One inch at the stair

Juniper’s standard Terra submission drew an 11 ft 9 in stair flight but specified an 11 ft 8 in run in the section. The revision matched the run to the plan and recovered four upstairs rooms. In the self-check submission, a different revision shrank the kitchen to 63 sq ft against a 65 sq ft minimum, costing one room’s access credit.

Before and after

Blue traces the sampled route. Red highlights rooms without access credit. Gold marks the stair flight and green marks its clear landing.

See it at eye level

The camera follows the graded route on the selected floor. Stair transfer is checked separately. This schematic view uses plan walls and openings with generic vertical dimensions.

Every matched pair

House / modelStandard firstSelf-check firstStandard revisedSelf-check revised

Cells show rooms reached, followed by the drawing-set score out of 100.

How we ran it

Each model saw each fresh sketch twice in separate sessions, with the same model configuration and effort. The self-check condition added one route-review instruction. We scored both first submissions before delivering any feedback. Every submission then received one revision opportunity, with its original brief, first drawing set, two untextured plan images and deterministic route findings. The repair instructions were the same in both groups.

The existing handoff grader gives 70 points for room access, 20 for brief and sheet checks, and 10 for opening coordination. It checks a two-foot square on a quarter-foot grid, three-foot doors, and coordination between stair plans, section and detail. Exact-fit gaps can fail. We count recovered rooms and previously passing rooms that lost credit, as well as changes to stair and sheet coordination. The view uses the same route but adds no tests for furniture, door swings, headroom or code compliance.

Cedar brief · Juniper brief · Self-check instruction · Revision instruction · Frozen inputs · Results data · Previous handoff round · Furniture, swings and headroom round · Visualization project that inspired the review passes